| SMI S.p.A., S.Giovanni Bianco (BG), Italy | February 5, 2010 |
All over the world thermoshrinking film has become the most used packaging material to pack food, beverages and non-food products.
New methane-heated shrinking tunnel As a consequence, shrinkwrappers - e.g. secondary packaging machines outputting packs overwrapped in shrunk film - have become very popular in the bottling and packaging lines of large and small producers. This packaging process requires a thermoshrinking tunnel (positioned after the film-overwrapping module) which, by means of the heat generated by electric resistances, gets the plastic film shrunk around the bottles and thus makes a solid and compact pack.

|
|
Smiflexi shrinkwrappers - LSK and SK series - can be equipped either with a standard electrically powered shrinking tunnel or with a new methane-heated model. The new tunnel type is a state-of-the-art solution, which, thanks to the combustion of natural gas in place of the use of electric resistances, produces the heat required for the film-shrinking operation. |
In comparison with the traditional combustibles used for electricity production, the methane features several advantages:
- its combustion is smogless and pollution-free;
- it is an environment-friendly product;
- in those countries where it is available at low price, it allows a dramatic cost-cutting in the energy procurement.
|
|

|
An actual example In SMI machine testing department, our technicians have carried out several trials in order to calculate the actual natural gas consumption during the thermoshrinking process; then, the results of the whole testing plan have been compared with the electricity consumption required to perform the same testing operations.
Test parameters

|
|
Tests have been carried out according to the following parameters:
a) test time: 1 hour after reaching the oven temperature of 200° C;
b) working mode: idling;
c) tunnel length: 3 meters;
d) speed: 35 m/min;
e) country: Italy;
f) period: end of August 2009;
g) average naturarl gas price: 0.33 Euro/m3;
h) average electricity price: 0.13 Euro per Kw/h
(operating costs not included).
|
Results
Under the same working conditions, the consumption monitored was equal to 3 m3 of methane and 25 Kw/h of electricity; such figures, multiplied by the two energy sources average market prices, have highlighted that the consumption cost of the methane-heated tunnel have been equal to 1 Euro per hour (3 m3 x 0.33 Euro = 1 Euro/h), versus a consumption cost of the electricity-fed tunnel of 3.25 Euro per hour (25 Kw/h x 0.13 Euro = 3.25 Euro/h). |
|

|
Such analysis makes it clear that, at least in Italy, the use of the natural gas-heated shrinking tunnel ensures a 70% saving in the energy consumption costs, in comparison with the traditional electricity-heated model. Furthermore, the time for reaching the working temperature is shorter by 75% in comparison with the electricity-powered tunnel (5 minutes with natural gas and 20 minutes with electricity ).
If you are looking for a cost-cutting and ambient-friendly solution, from now on you can select Smiflexi's brand-new methane-heated shrinking tunnel to be joined to your Smiflexi shrinkwrapper.
|